Showing items 1 to 100 from total of 555 items. Ordered by location # descending.
Location # ![]() |
Video | Photo | Caption | Categorisation |
---|---|---|---|---|
110654 | ![]() | Riverside walk junction with Duke Street | Other: Infrastructure general | |
110653 | ![]() | Riverside walk junction with Duke Street | Other: Infrastructure general | |
110651 | ![]() | Riverside walk junction with Duke Street | Other: Infrastructure general | |
110649 | ![]() | Riverside walk | Other: Infrastructure general | |
110648 | ![]() | Riverside walk | Other: Infrastructure general | |
110645 | ![]() | Riverside Walk | Other: Infrastructure general | |
102190 | ![]() | Wide and direct cycle crossing with segregated pedestrian crossing. Sadly this is two stage with a long wait at each stage. | Cycleway: Infrastructure cycleways | |
102189 | ![]() | Wide and direct cycle crossing with segregated pedestrian crossing. Sadly this is two stage with a long wait at each stage. | Cycleway: Infrastructure cycleways | |
102188 | ![]() | Two way cycle lane with narrow bollards | Cycleway: Infrastructure cycleways | |
102187 | ![]() | Two way cycle lane with narrow bollard spacing (1.1m) | Cycleway: Infrastructure cycleways | |
95003 | ![]() | Stepped cycle track with island protection on the corner | Cycleway: Good practice cycleways | |
95002 | ![]() | Stepped cycle track with island for protection on the corner | Cycleway: Good practice cycleways | |
95001 | ![]() | Dedicated cycle waiting area and signals phase. First time in Norwich and with low level signals. | Road environment: Good practice road | |
94999 | ![]() | Lamberts coaches blocking the cycle track on Tombland | Obstruction: Event obstructions | |
94560 | ![]() | Loading on the cycle track | Obstruction: Event obstructions | |
94559 | ![]() | Parking on the cycle track | Obstruction: Event obstructions | |
94558 | ![]() | Loading in the contraflow cycle lane | Obstruction: Event obstructions | |
94557 | ![]() | Optional route for NCN1 | Cycleway: Infrastructure cycleways | |
91324 | ![]() | A barrier that prevents standard cycles from getting through on a signed cycle route | Obstruction: Problem obstructions | |
87852 | ![]() | Newly built access to cycle parking at Aviva featuring steps and wheel ramps. | Cycle parking: Good practice cycleparking | |
85895 | ![]() | Form over function? This foot and cycle bridge is hazardous in wet weather. Jarrold Bridge | Cycleway: Infrastructure cycleways | |
85894 | ![]() | Form over function? This foot and cycle bridge is hazardous in wet weather. Jarrold Bridge | Cycleway: Infrastructure cycleways | |
84238 | ![]() | New type of sign "Pedestrian and Cycle Zone" on Westlegate, Norwich | Road environment: Infrastructure road | |
83096 | ![]() | Part of the recently constructed cycleway between Witham and Kelvedon | Cycleway: Infrastructure cycleways | |
83095 | ![]() | It's unclear what the cycle logo in the road is for. | Road environment: Infrastructure road | |
81969 | ![]() | The segregated cycle path on the right crosses junctions by merging with the road across the junction and then becoming kerb separated again. This probably works better on short junctions | Cycleway: Infrastructure cycleways | |
81968 | ![]() | Cycle parking with electric charging points. | Cycle parking: Infrastructure cycleparking | |
81967 | ![]() | Narrow cycle lanes in the dooring zone | Road environment: Infrastructure road | |
81966 | ![]() | The 'bollard' in the centre probably aims to prevent motor vehicles, it also has direction and distance information. It's very visible. | Route sign: Infrastructure routesigns | |
81965 | ![]() | Rural cycleway on the route of a former railway. | Cycleway: Infrastructure cycleways | |
81964 | ![]() | There are signs directing you to the cycle parking, which is then a bit underwhelming! Opposite there are some wheel-bender stands. | Cycle parking: Infrastructure cycleparking | |
74265 | ![]() | Very poor visibility at this crossing. | Other: Infrastructure general | |
74263 | ![]() | Multiple entrances on this stretch of road would be dangerous without a competent design. | Road environment: Infrastructure road | |
74262 | ![]() | Any space for cycling here? | Road environment: Infrastructure road | |
74261 | ![]() | New build cycle track takes the basic concepts but fails to understand the point. People emerging from the bus shelter can't see cyclists going past. Slabbed area on the right should have been the footway. | Cycleway: Infrastructure cycleways | |
74260 | ![]() | New build cycle track takes the basic concepts but fails to understand the point. Planing on the left interrupts the footway (in light slabs) right by bus stop, causing conflict. | Cycleway: Infrastructure cycleways | |
74259 | ![]() | New build cycle track takes the basic concepts but fails to understand the point. The footway (light grey slab paved area) is interrupted by planting that forces cycles and pedestrians in to conflict. | Cycleway: Infrastructure cycleways | |
74258 | ![]() | New build cycle track takes the basic concepts but fails to understand the point. Nasty staged junction with railings to get to the next part of the cycle route. | Cycleway: Infrastructure cycleways | |
74257 | ![]() | New build cycle track takes the basic concepts but fails to understand the point. Separation here is quite good. | Cycleway: Infrastructure cycleways | |
74256 | ![]() | New build cycle track takes the basic concepts but fails to understand the point. Here the cycle track is separated from traffic by a bay and there is a separate footway. | Cycleway: Infrastructure cycleways | |
74166 | ![]() | Norse van blocking cycle path at entrance to St Andrews Car Park | Obstruction: Event obstructions | |
73035 | ![]() | Cycle path to Gurney Road at Heathgate junction. | Cycleway: Infrastructure cycleways | |
73034 | ![]() | Gurney Road to Heathgate cycle path | Cycleway: Infrastructure cycleways | |
73033 | ![]() | Gurney Road to Heathgate cycle path | Cycleway: Infrastructure cycleways | |
72485 | ![]() | The entry to the Tombland cycleway if heading south on Palace Street. Should you want to turn right in to Wensum Street...? | Road environment: Infrastructure road | |
72484 | ![]() | Very subtle plaques are used to indicate the cycle track. These are ignored or not seen by most people walking. | Cycleway: Infrastructure cycleways | |
72483 | ![]() | New 1.5m advisory cycle lanes on Palace Street work when there's no traffic, see #72469 for rush hour. | Road environment: Infrastructure road | |
72482 | ![]() | 1.5m advisory cycle lanes have been added to Palace Street with limited success. There is a pair of bollards just before the up ramp. | Road environment: Infrastructure road | |
72481 | ![]() | Cycleway from Palace Street. Oncoming cycles are signed to turn right to rejoin the road here. | Cycleway: Infrastructure cycleways | |
72480 | ![]() | A view of the Palace Street (left), Tombland (ahead) and Wensum Street (behind) junction. Cycle can join the cycleway using the gap in the kerbs towards the middle of the picture. | Cycleway: Infrastructure cycleways | |
72479 | ![]() | An informal zebra crossing of the cycle track leading to a 'customary crossing' of the road. | Cycleway: Infrastructure cycleways | |
72478 | ![]() | A rather confusing array of paving styles used on the cycleway in Tombland outside the Erpingham Gate. | Cycleway: Infrastructure cycleways | |
72477 | ![]() | Informal zebra crossing of the cycle track to reach a pelican crossing. The waiting area is rather small and the cycle symbols hard to see. | Cycleway: Infrastructure cycleways | |
72476 | ![]() | Signalled cycle crossing to Princes Street. The pedestrians are on the cycle track, the footway is behind the camera. | Cycleway: Infrastructure cycleways | |
72475 | ![]() | The exit from the cycle track is in to the path of left turning vehicles and buses pulling in to the stop behind the turning car. | Cycleway: Infrastructure cycleways | |
72474 | ![]() | Two way segregated cycle track in Tombland with signalled crossing on the right to cross to Princes Street. The pedestrians are about to walk on the cycleway. The design for cycles rejoining the road here is poor. | Cycleway: Infrastructure cycleways | |
72469 | ![]() | Palace Street was closed for six months for construction works in Tombland. It has reopened with advisory cycle lanes. Now there is queuing traffic and Norwich drivers seem unaware that they need to keep out of the lane. Couldn't this street have remained closed to motor vehicles? | Road environment: Infrastructure road | |
72444 | ![]() | Unfortunately routing a cycle lane across a queue to a car park doesn't work. | Road environment: Problem road | |
72443 | ![]() | Cycle track under construction between Gurney Road and Heathgate | Cycleway: Infrastructure cycleways | |
68065 | ![]() | A sculpture and seat made from rails on NCN 1, Marriotts Way | Cycleway: Infrastructure cycleways | |
67765 | ![]() | Westlegate, Norwich. | Road environment: Infrastructure road | |
67764 | ![]() | Westlegate, Norwich | Road environment: Infrastructure road | |
67763 | ![]() | Westlegate, Norwich | Road environment: Infrastructure road | |
67762 | ![]() | Ber Street near the junction with Thorn Lane. | Road environment: Infrastructure road | |
67761 | ![]() | Ber Street from the corner of Thorn Lane. | Road environment: Infrastructure road | |
67760 | ![]() | Ber street | Road environment: Infrastructure road | |
67759 | ![]() | Ber Street near the junction with Thorn Lane. | Road environment: Infrastructure road | |
67758 | ![]() | Ber Street looking towards Golden Ball Street. | Road environment: Infrastructure road | |
67757 | ![]() | Ber Street near junction with Thorn Lane. | Road environment: Infrastructure road | |
67756 | ![]() | Ber Street | Road environment: Infrastructure road | |
67755 | ![]() | Ber Street and Golden Ball Street junction. | Road environment: Infrastructure road | |
67754 | ![]() | Ber Street and Golden Ball Street junction | Road environment: Infrastructure road | |
67753 | ![]() | All Saints Green and Westlegate | Road environment: Infrastructure road | |
67752 | ![]() | Ber Street at the junction with Golden Ball Street. | Road environment: Infrastructure road | |
67751 | ![]() | Golden Ball Street, Norwich | Road environment: Infrastructure road | |
67750 | ![]() | Westlegate and Ber Street junction | Road environment: Infrastructure road | |
67749 | ![]() | All Saints Green, Norwich | Road environment: Infrastructure road | |
67748 | ![]() | All Saints Green, Nowich | Road environment: Infrastructure road | |
67747 | ![]() | Junction of Cattle Market Street and Rouen Road. | Road environment: Infrastructure road | |
67746 | ![]() | Rouen Road at its junction with Cattle Market Street. | Road environment: Infrastructure road | |
67745 | ![]() | View of Cattle Market Street, Norwich | Road environment: Infrastructure road | |
67744 | ![]() | View of Cattle Market Street, Norwich | Road environment: Infrastructure road | |
67721 | ![]() | Barriers prevent use by all types of bicycles. | Obstruction: Problem obstructions | |
67518 | ![]() | Barriers prevent use of this path by most bicycles. | Obstruction: Problem obstructions | |
65706 | ![]() | Free to use pump outside Cycle Republic at Castle Mall. | Bike shop: Good practice bikeshops | |
65530 | ![]() | Just finished cycle only traffic signals at the southern end of the contraflow on Magdalene Street, Norwich. | Cycleway: Infrastructure cycleways | |
65367 | ![]() | Danish-style segregated cycle track on Hills Road. Kerbs are in with tarmac surface yet to come. | Other: Infrastructure general | |
65366 | ![]() | Bus stop bypass under construction on Huntingdon Road south of the junction with Lawrence Weaver Road. | Dutch-style cycleway: Good practice dutchcycleways | |
65364 | ![]() | Almost complete segregated cycle track just south of Girton Corner on Huntingdon Road. | Dutch-style cycleway: Good practice dutchcycleways | |
65363 | ![]() | Almost complete segregated cycle route just south of Girton Corner on Huntingdon Road. | Dutch-style cycleway: Good practice dutchcycleways | |
65138 | ![]() | Improved access to Cutter Ferry Path, see #28021 for situation before. The bollards have been 'thinned out' and the kerb is now flush. | Cycleway: Infrastructure cycleways | |
65042 | ![]() | Marriott's Way, NCN 1, doesn't have a sealed surface here and is sticky in places. | Cycleway: Infrastructure cycleways | |
65026 | ![]() | Shared use path passing behind a bus stop. | Cycleway: Infrastructure cycleways | |
65025 | ![]() | Shared use path on Earlham Road. | Cycleway: Infrastructure cycleways | |
65024 | ![]() | Shared use path along Earlham Green Lane. | Cycleway: Infrastructure cycleways | |
65023 | ![]() | Shared use path crossing Hutchinson Road. This could be improved by keeping the path level and adding give way on the carriageway. | Cycleway: Infrastructure cycleways | |
65022 | ![]() | Shared use path on Clover Hill Road, although some prefer the road. | Cycleway: Infrastructure cycleways | |
65021 | ![]() | Dragonfly Way is a shared use route to the local shops. | Cycleway: Infrastructure cycleways | |
65020 | ![]() | Anti cycling barriers where Cricket Way crosses Bishy Barnebee Way. A cargo bike cannot easily go through. | Cycleway: Problem cycleways | |
65019 | ![]() | Cricket Way segregated route through this housing estate mostly uninterrupted by side roads. | Cycleway: Infrastructure cycleways |