Donate using PayPal

richardm

Photos

Showing items 1 to 100 from total of 201 items. Ordered by location # descending.

Location # Icon Video Photo Caption Categorisation
109232Photo #109232No significant provision for cycling on the new Ely Southern bypassOther:
Infrastructure
general
109231Photo #109231New footbridge over the river and railway, alongside the new Ely Southern Bypass. Cyclists Dismount signs at each end totally unnecessary :-(Track:
Infrastructure
track
109230Photo #109230Cyclists Dismount. Why? RidiculousGeneral sign/notice:
Problem
signs
109229Photo #109229I'm confused by this sign - it says beware of lorries pulling out, but seems to show a lorry pulling in. What's needed are signs telling drivers to look out for cyclists, not the other way round.General sign/notice:
Problem
signs
104470Photo #104470The world's first (and only?) solar-powered passenger train has on-board parking for four bikes. byronbaytrain.com.au/Other:
Good practice
general
104469Photo #104469Not sure the graphic on this sign really helps.General sign/notice:
Infrastructure
signs
104468Photo #104468Cycling is allowed on this stretch of "motorway"! (Position approximate, in NSW)Other:
Infrastructure
general
104224Photo #104224Cycle parking hoops, Byron Bay styleCycle parking:
Infrastructure
cycleparking
103929Photo #103929Cycle stands at 65cm spacing - hopeless! C'mon @sainsburys please do better than this :-(Cycle parking:
Problem
cycleparking
103784Photo #103784Camcycle new stall bike and gazebo at Mill Road Winter Fair 2018.Other:
Event
general
103783Photo #103783Camcycle new stall bike and gazebo at Mill Road Winter Fair 2018Other:
Event
general
103459Photo #103459Debris from a bus guidewheel on the Guided BuswayObstruction:
Infrastructure
obstructions
102927Photo #102927Poorly designed cycle parking at @Morrisons St Ives. Difficult to get to the back row of stands if the front row is occupied.Cycle parking:
Problem
cycleparking
102866Photo #102866A new sign has appearedGeneral sign/notice:
Misc
signs
102865Photo #102865The road is closed to motor traffic for construction of new town Northstowe but an attendant controls the construction vehicles to allow cyclists (and horses and pedestrians) to pass through the works.Temporary closure:
Good practice
closure
102864Photo #102864A quite unnecessary sign!General sign/notice:
Event
signs
102582Photo #102582Three Sheffield Stands discovered in the undergrowth!Cycle parking:
Good practice
cycleparking
101637Photo #1016373m wide cyclewayCycleway:
Infrastructure
cycleways
101636Photo #101636Not sure of the status of this trackObstruction:
Infrastructure
obstructions
101635Photo #101635Difficult to get through this gate at the end of SummerObstruction:
Infrastructure
obstructions
101634Photo #101634Track here is quite good cycling (at least at this time of year)Track:
Infrastructure
track
101633Photo #101633Newish cycleway, 3m wideCycleway:
Infrastructure
cycleways
101632Photo #101632Asphalt cycleway about 2m wideCycleway:
Infrastructure
cycleways
101631Photo #101631Use of an old road as part of cyclewayCycleway:
Infrastructure
cycleways
101613Photo #101613Can a landowner legally threaten to remove a bike on the public highway, locked to their railing?Cycle parking:
Misc
cycleparking
100377Photo #100377Diversion of NCN11 to pass under the new Ely southern bypassCycleway:
Infrastructure
cycleways
99800Photo #99800Not sure if this implies cyclists have priority over side road or notCycleway:
Infrastructure
cycleways
99799Photo #99799Quiet rural road on NCN 12 heading towards HuntingdonRoad environment:
Infrastructure
road
99798Photo #99798Farmer says you shall not pass!Obstruction:
Problem
obstructions
99797Photo #99797Quiet rural fen road north of Somesham. Unfortunately is doesn't go anywhere, see next photoRoad environment:
Misc
road
99556Photo #99556Cog to Cog Bike Techcentre (with cake!)Bike shop:
Misc
bikeshops
98811Photo #98811An Ofo bike, 10 miles from Cambridge.Bike share:
Misc
bikeshare
98392Photo #98392Other:
Infrastructure
general
97743Photo #97743When the bridleway is flooded, cyclists and pedestrians between Swavesey and St Ives are forced to walk along the top of the embankment, unnervingly close to the bussesRoad environment:
Problem
road
97742Photo #97742Woefully insufficient cycle parking for visitors to this Market locationCycle parking:
Problem
cycleparking
97741Photo #97741The compulsory helmet law is widely disregarded in this town :-)Other:
Misc
general
97065Photo #97065Sign in NSW asking drivers to give 1m clearance to cyclists, if driving less than 60kphGeneral sign/notice:
Infrastructure
signs
96249Photo #96249Nice house number!General sign/notice:
Good practice
signs
91719Photo #91719An unusual side line for a fruit farm!General sign/notice:
Misc
signs
89627Photo #89627The office cycle parkingCycle parking:
Infrastructure
cycleparking
89539Photo #89539Sign warning against rat running through Addenbrooke'sGeneral sign/notice:
Infrastructure
signs
89258Photo #89258Easter Bank Holiday Monday traffic on the road into ReachCongestion:
Event
congestion
83487Photo #83487Free-to-use bicycle tyre pump at the Swavesey stop. Unfortunately is seems you need to bring your own connector, to use it :-(Other:
Infrastructure
general
80565Photo #80565More cycle parking for another 60 bikes added at Longstanton Park & RideOther:
Infrastructure
general
73116Photo #73116That's telling them!General sign/notice:
Good practice
signs
72913Photo #72913These are the bollards noted in Robin's photo #67374. Not only silly, but they look lethal to me. If anybody collides with one of these, the plate on top could take quite a slice into flesh.Other:
Infrastructure
general
72912Photo #72912Bollards at entrance to cycleway along section of guided busway to new railway station. 1.40m high spaced at 1.50m centre to centre. Cycleway is 3.80m wide here.Obstruction:
Infrastructure
obstructions
70513Photo #70513Temporary signs (#67259) added last year during the road works at the A14/M11 Girton Interchange have been replaced by these. Is this what the Prime Minister meant when he said two or three years ago that he would ensure that all highway designs would be cycle-proofed? Presumably these are advisory, so not legally enforceable?General sign/notice:
Infrastructure
signs
70512Photo #70512They've added some particularly fatuous cycle parking stands at Tesco Bar Hill - only a small child's cycle could use any position other than the two outer flanks, because of the cross bar.Cycle parking:
Problem
cycleparking
67259Photo #67259The Girton interchange on the A14 closed to bikes during road works (but not pedestrians?).Roadworks:
Event
roadworks
67206Photo #67206Cyclists Dismount - at the dead end of a cul-de-sac!General sign/notice:
Problem
signs
67159Photo #67159The wonderful Torque Bikes bike shop stayed open into the night, for the Dunwich Dynamo.Bike shop:
Event
bikeshops
62762Photo #62762Don't think I've seen this type of sign before, warining drivers turning into a petrol station that they are crossing a (shared use) cycle pathGeneral sign/notice:
Infrastructure
signs
62725Photo #62725stainless steel Sheffield stands, well spacedCycle parking:
Good practice
cycleparking
62724Photo #62724local courier bikeBicycle:
Misc
bicycles
62723Photo #62723quite difficult to cycle through here while the market is in operation!General sign/notice:
Misc
signs
62721Photo #62721a casual attitude to bikes in this pedestrianised streetGeneral sign/notice:
Good practice
signs
62720Photo #62720Two bike shops side by side!Bike shop:
Infrastructure
bikeshops
62719Photo #62719two bike shops side-by-side!Bike shop:
Misc
bikeshops
62718Photo #62718Concrete two-way cycle track approx 2.7m wide (for bikes only)Cycleway:
Infrastructure
cycleways
62717Photo #62717You can take your bike on the underground trains in Sydney :-)Bicycle:
Good practice
bicycles
62650Photo #62650This is how you carry your surf board to the beachBicycle:
Misc
bicycles
57216Photo #57216Layby has now been closed and converted into continuation of the cycleway. (See previous #35833)Cycleway:
Infrastructure
cycleways
54814Photo #54814Bicycle advertizingBicycle:
Misc
bicycles
54813Photo #54813Warning of shared use path at exit from private developmentGeneral sign/notice:
Infrastructure
signs
54812Photo #54812Covered cycle parking at Darwood Car Park, St IvesCycle parking:
Good practice
cycleparking
53770Photo #53770A gate has appeared across my route to work! Eh?
Over Road, Longstanton
Obstruction:
Problem
obstructions
53562Photo #53562New location for The Bike CentreBike shop:
Infrastructure
bikeshops
52718Photo #52718Direct Cycles - a new bike shop in ChestertonBike shop:
Misc
bikeshops
52717Photo #52717Wheeling channel on the steps over Bottisham LockRoad environment:
Infrastructure
road
49602Photo #49602Roadworks in Over Road, Longstanton.Road environment:
Infrastructure
road
48297Photo #48297Longstanton Park & Ride on a Sunday - great place for children to learn to cycleBicycle:
Infrastructure
bicycles
47760Photo #47760Pathway raised above flood level for walkers and cyclists. Clear width 1.0mRoad environment:
Good practice
road
47759Photo #47759Pathway raised above flood level for pedestrians and cyclistsRoad environment:
Good practice
road
45182Photo #45182The end of the V5 routeRoute sign:
Infrastructure
routesigns
45181Photo #45181Pleasant cycle track set back from the coast road along the Cote SauvageCycleway:
Good practice
cycleways
45179Photo #45179Contra-flow cycling allowed, without apparently the need for lane markingRoad environment:
Good practice
road
44321Photo #44321Possible cycle/pedestrian route below A505Cycleway:
Infrastructure
cycleways
44320Photo #44320Possible cycle/pedestrian route below A505 at Whittlesford stationCycleway:
Infrastructure
cycleways
40151Photo #40151Red squirrel in the Lake District on Sustrans C2C route.Road environment:
Event
road
38364Photo #38364Track (public bridleway) alongside the New Bedford River from Mepal towards Welney. Unsurfaced but cyclable ~10mphTrack:
Infrastructure
track
36890Photo #36890New cycle parking provided by the Nature Reserve bus stop, by the RSPB. Unusual variation of the Sheffield stand.Cycle parking:
Infrastructure
cycleparking
36397Photo #36397Cycle parking at Tesco Bar Hill. These racks are spaced at 59cm!Cycle parking:
Misc
cycleparking
36098Photo #36098Long Lane, grass trackTrack:
Misc
track
36097Photo #36097Cycle access here by lifting the bike over the guide railsTrack:
Misc
track
36096Photo #36096Track towards RamptonTrack:
Misc
track
36095Photo #36095Access to the Guided Bus trackTrack:
Misc
track
36094Photo #36094Rampton Road becomes a grass trackTrack:
Misc
track
36093Photo #36093Rampton Road becomes a trackTrack:
Misc
track
36092Photo #36092Sign showing change of status beyond the busway, towards RamptonGeneral sign/notice:
Misc
signs
35833Photo #35833A pity the new cycleway is interrupted by this unsurfaced laybyCycleway:
Infrastructure
cycleways
35832Photo #35832New cycleway built from Guided Busway towards LongstantonCycleway:
Infrastructure
cycleways
35831Photo #35831New cycleway built from Guided Busway towards LongstantonCycleway:
Infrastructure
cycleways
35830Photo #35830New cycle path built from Guided Busway towards LongstantonCycleway:
Infrastructure
cycleways
35145Photo #35145In Hawaii, they have padded pedals, so they can ride barefoot! (Location approximate)Bicycle:
Misc
bicycles
34797Photo #34797Cycle parking at South Cambridgeshire DC OfficesCycle parking:
Good practice
cycleparking
33687Photo #33687Cycle King bike shopBike shop:
Misc
bikeshops
33686Photo #33686Revel Outdoors bike shopBike shop:
Misc
bikeshops
33685Photo #33685Tan Hill Inn claims to be Britain's highest Inn at 1732ft.Destination:
Misc
destinations
33684Photo #33684Spitfire Cycles bike shopBike shop:
Misc
bikeshops

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://www.cyclestreets.net/users/richardm/photos/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.